1 results listed
In recent years, Turkey’ energy consumption has
increased with the increasing rate parallel to the growth rate. For
this reason, the importance of efficient use of energy has become
more and more remarkable every day. In this study, the potential
of ability to the work by the control and automation of the
electrostatic powder coating system in a sample operation is
increased. In addition, efficiency has been ensured in terms of
natural gas consumption and electricity consumption. In terms of
the coating operation, the amount of dye consumed per unit m2
has been reduced and the operating costs have been reduced. In
this context, surface cleaning, drying, dyeing and curing steps in
the electrostatic powder coating cabinets in the dying cabinets
have been transferred to the conveyor system. For electricity and
natural gas consumption, the cost of energy consumption per m2
is calculated to produce unit work for energy efficiency. Feasibility
studies were made for the facility and the system was installed.
The simple payback period is calculated and the increase in the
total efficiency of the system and the increase in capacity are
presented.
International Iron & Steel Symposium
UDCS
Demet Taskan
Ahmet Serhan Hergul
Volkan Coban
Durmuş KAYA